How much time will school districts have to buy the new instructional materials?

Posted by:
The requirement that instructional materials be purchased within 24 months of SBE adoption (for kindergarten through grade eight) or local governing board action (for grades nine through twelve) has been suspended by the Legislature until July 1, 2015. It is not clear what will happen after that date. The original “24 month rule” requirement (EC Section 60422) becomes inoperative on July 1, 2013, and is repealed on January 1, 2014, so if no action is taken by the Legislature this requirement will not take effect.
 
Author: